How Your Machine Gets From Our Bench To Yours

Every jewelry laser welder leaves through the same last gate: a packing check worked through against your order, because most of what arrives wrong was packed wrong rather than built wrong.

Shipping Is The Last Stage, Not A Separate One

A machine reaches the crate only after four stages of building and testing. Packing is stage five, and it is checked against your order rather than against a generic list.

Stage 1

Assembly

Source, optics, cooling and controls built into the housing.

Stage 2

System check

Electrical, cooling and control systems brought up and checked.

Stage 3

Functional test

Laser output, optical path and viewing system aligned.

Stage 4

Application test

A real jewelry weld on the finished machine.

Stage 5 — this page

Packing

Configuration, accessories, optical protection and documentation checked against your order.

See what gets checked before shipment

Five Stages Between Our Bench And Yours

Where each section of this page sits in the sequence, and where responsibility passes from us to you.

Schematic of the five shipping stages A line diagram, not a photograph. Five stages in sequence: final packing check, dispatch, customs clearance, arrival, and acceptance on your bench. Shipments are DDP, so responsibility passes to you at the arrival stage, on delivery. 1 · Final packing check 8 items, against your order 2 · Dispatch DHL or FedEx · DDP 3 · Customs clearance papers travel with the crate 4 · Arrival inspect before you sign 5 · Acceptance powered up, test piece welded Under DDP, responsibility passes here — on delivery to you Schematic — a diagram of the sequence, not a photograph of our facility or packaging.
This is a schematic, not a photograph. It shows the order things happen in. We have not put stock images of crates or workshops on this page, because a photograph here would read as our crate — and we would rather show you the real one on a video call than imply one on a web page.

The One Packing Item That Decides Delivery Day

Eight things are checked before the crate closes. One of them is the reason a perfectly good machine can still be useless on the morning it arrives.

Why this one, out of eight

Optics can be realigned. A missing fixture can follow on in a second parcel. But a machine set for the wrong supply cannot be talked around on the day it lands — and it is decided here, before the crate closes, not on your floor.

Nothing is broken, and nothing is anyone’s fault. The machine simply sits there, and the repair work you bought it for keeps going out to a trade shop.

That is what it looks like in practice. The crate opens, the plug does not fit the socket or the supply is not what the unit was set for, and the bench waits while an electrician is booked and a transformer is sourced. Days, sometimes weeks, on a machine that was built and tested correctly.

So it is set here, not there

The destination country’s supply is set on the unit before it is packed, and the plug fitted to match. That is why the order asks for voltage, phase and the socket you will actually plug into. Not to make the form longer — because this is the one detail nobody can correct from our side once the crate is sealed.

If it is still wrong when it arrives

Stop before you unpack further and send us two things: the serial number and a photograph of the rating plate. Both tie back to the record of the machine that actually left here, which is the fastest route to a real answer rather than a guess.

The serial travels twice

The unit’s serial number is recorded against the shipment and against its own QC record, so what left here can be matched to what arrived.

Photographed before sealing

Configuration, accessories and internal packing are photographed as they went in, so what was in the crate is documented rather than remembered.

Packed for the route

Crate and internal packing are checked against the route the machine is taking, not against a single standard box.

The full packing check, in order

  • Machine configuration matched to the order, including optics and viewing system
  • Accessories present and counted — fixtures, pedal, tooling, starter consumables
  • Power plug and voltage set for the destination country
  • Optical protection fitted for transit
  • Manual and documentation included in the language agreed on the order
  • Serial number recorded against the shipment and the QC record
  • Crate and internal packing checked for the route the machine is taking
  • Photographs taken before sealing, so what left here is documented

Six Things We Need From Your Side

Each one changes something that is set before the crate closes. Sending them with the enquiry saves a round of emails later.

1

Destination address and country

Including whether the consignee is a business or a residential address — freight is handled differently.

2

Supply voltage, phase and socket type

The single item above. Send what is on your bench, not what is standard for your country.

3

Delivery access at your end

Ground floor or upstairs, loading dock or kerbside, and whether a pallet truck or forklift is on site.

4

Consignee details for the paperwork

The name and address the shipment should be consigned to. Clearance itself is ours — we act as importer of record — so you do not need a broker at your end.

5

Any document your import or insurer requires

See the next section for what we can supply. Ask before the order, not at the border.

6

The language for the manual

Documentation is packed in the language agreed on the order, so it needs to be agreed on the order.

What Travels With The Machine

Ask for whichever your import or your insurer needs. These are supplied for the machine you are ordering, not as generic samples.

CE declaration

Supplied on request for the machine you are ordering.

RoHS declaration

Supplied on request for the machine you are ordering.

Quality record

The unit’s own QC record, by serial number — not a specimen of another machine.

Export documentation

Commercial invoice, packing list and the papers your route requires.

If a specific standard or document is a condition of your purchase, ask before you order rather than after. We would rather tell you what we can supply than have it turn up short at customs.

The First Hour After The Truck Pulls Up

Most of what goes wrong in transit is recoverable, but only if it is recorded before the driver leaves.

1

Walk the crate before you sign

Corners, straps, any lean in the load, and any tilt or shock indicator on the crate itself.

2

Photograph anything marked, while it is still on the vehicle

Then write it on the carrier’s paperwork before you sign, and report it to the carrier within 3 days of delivery. A clean signature is hard to walk back afterwards.

3

Count the pieces against the packing list

Accessories and consumables do not always travel in the same box as the machine.

4

Unpack with a second pair of hands

Keep the crate and the internal packing until the machine has been powered up and has welded a test piece.

5

Send us the serial number when it lands

It is how we pull that unit’s own QC record if anything needs looking at.

What Applies To Every Shipment

These are standard rather than negotiated per order. The ones that still depend on your configuration are listed underneath, named rather than guessed at.

Freight termsDDP — delivered duty paid to your address
CarrierDHL or FedEx
Duties, taxes and clearanceWe pay them, and we act as importer of record
Reporting transit damageWithin 3 days of delivery, to the carrier — see the arrival steps above
DestinationsNo country restrictions. Tell us where it is going and we will ship there

Still confirmed against your specific order, because they move with the configuration and the destination:

  • How long the build takes before dispatch
  • Transit time from dispatch to your door
  • What the freight itself comes to
  • Transit insurance — cover and value
  • On-site installation — where, and for which machines
  • Which supply voltages and plug types we can set

Ask for the ones on the right before you place the order, not after. We would rather tell you what applies to your route while you can still act on it than apologise for it once the machine is moving.

Delivery Is Where The Support Starts

The part of the decision that is hardest to judge from a website is what happens once the machine is on your bench.

Machine setup

Siting, cooling, gas and optics alignment walked through rather than left to the manual.

Operator training

Built around the jobs your bench takes in, so the first weld is real work.

Parameter guidance

Starting values by alloy, then stored presets so a proven setting is recalled rather than re-found.

Spare parts

Wear parts and consumables identified from your model and serial before you order them.

See how support works after delivery

Tell Us Where It Is Going

Send the country, the supply at your bench and how the machine will be delivered, and we will come back with what applies to your route rather than a general answer. We aim to reply within 24 business hours.

  • Questions about documents? Say which one your import needs.
  • Not sure of your supply? A photograph of your socket and consumer unit is usually enough.
  • Still choosing a machine? Start with the buying guide or the FAQ.